Substantially Completed Projects

The project aimed at improving water supply services to the population in Isingiro District enroute Kagera – Mbarara highway. The key components included; construction of a water intake (12,000 m3/day), construction of a water treatment plant (4,000 m3/day), laying of 51.8 km of water distribution network, installation of a water storage (1,150 m3) and construction of sanitation facilities. The system was substantially completed and system testing commissioned.

The project aimed at improving water supply and sanitation services in the towns of Adjumani town council, Pakele, Dzaipi and Ciforo. The Project entailed; construction of a water intake (12,000 m3/day), construction of a water treatment plant (4,000 m3/day), laying of 51.8 km of water distribution network, installation of a water storage (1,150 m3) and construction of sanitation facilities. The system was successfully test commissioned.